Decommissioning a nuclear power facility is a very complex and lengthy process. In recent years various decommissioning strategies have been developed, which include immediate dismantling, deferred dismantling (which occurs after radioactivity has been allowed to decay under controlled conditions) and entombment, where radioactive contaminants are encased on site in structurally sound material such as concrete. Whichever strategy is adopted, time scales are generally measured in decades and many critical stages are involved.

Blakley Electrics have recently been involved with a dismantling project, which is nearing the end of the process. The high level radioactive material has been removed from site and the next stage is for low level radioactive material to be removed. This involves the stripping out and removal of all permanent services, including the top few millimetres of any contaminated walls and surfaces. Once this has been achieved, the building will be deemed clean and can be demolished in the conventional manner, leaving the site fully restored and fit for normal use.

To enable all of the low level material to be removed, the contractor has installed an array of 40 no. custom built, free-standing Power Clusters around the site. The specially built Power Clusters provide 400V, 230V and 110V plug-in power for the different contractors working on site. Safe working is a top priority and all mains voltage sockets are switched and interlocked to prevent insertion or withdrawal of plugs on load, and they are also RCD protected. The Power Clusters incorporate 2 no. 5 kVA transformers, each providing a 110V Reduced Low Voltage supply. One transformer feeds 110V sockets fitted to the Power Cluster and one transformer feeds temporary lighting. As the line to earth shock voltage is only 55V, the 110V sockets are not RCD protected. However, as the lighting circuits are potentially longer, they are protected by MCBs and RCDs, to ensure compliance with the 5 second disconnection time required by BS7671 for RLV circuits.

Because all of the original permanent services have to be removed, the main contractor has also had to install temporary 110V lighting throughout the site. Most areas have no natural light and the facility also features many small rooms and corridors. For these reasons a high percentage of fittings require integral emergency modules. As the site does not work 24/7, the contractor needs to turn off most lights out of hours to save energy and reduce carbon emissions. Due to the wide use of emergency fittings and the consequent need to maintain a supply to emergency modules to keep batteries charged and to prevent damage to tubes (through repetitive discharging), Blakley Electrics unique Flori-67/4P plug-in lighting system has been installed, which features 4 core cabling and connectors. The lighting is fed from the Power Clusters, which incorporate a time clock and controlgear to switch off the tubes in fittings, whilst providing an unswitched supply to emergency modules, ensuring batteries are always fully charged. Key switches are also incorporated to enable emergency lights to be tested without interfering with non-emergency lighting.

Please open the associated pdf to see further product images and a schematic diagram of the Power Cluster and lighting system on page 2. If you require further details, please contact us.

Download PDF

Project No:

SP011

Industry

Industrial Building Services, Nuclear

Category

Permanent Distribution

Year

2013