Construction | 2025
CT Chambers for SSE Installations
Project number: SP117
We produce a standard range of CT Chambers, in ratings from 800A to 2000A, specifically designed...
Read moreConstruction | 2024
Power Cluster and Power Cluster Plus...
Project number: SP116
Power Clusters are final distribution assemblies fed from a single supply, fitted with a group of...
Read moreConstruction | 2024
Floodlighting of Large Scale Decommissioning Works...
Project number: SP113
The dismantling and decommissioning of a large industrial complex can be a lengthy and dangerous process...
Read moreConstruction | 2024
800A Mains Distribution Assembly with Segregation...
Project number: SP112
800A Mains Distribution Assembly with Segregation to Form
Read moreConstruction | 2023
Mains Distribution Assembly, 630A, with Form...
Project number: SP106
To enable major construction projects to meet fast track delivery programs without compromising on-site safety, we...
Read moreConstruction | 2023
Supplies to Charging Stations for On-Site...
Project number: SP105
As major construction companies begin to grapple with the challenge of becoming carbon neutral, the adoption...
Read moreConstruction | 2023
Tunnel Distribution Assembly, 630A
Project number: SP103
A recent requirement for free-standing, 400V tunnel distribution assemblies, which are to supply temporary Low Voltage...
Read moreConstruction | 2022
Form 4 Mains Distribution Assembly, 2500A,...
Project number: SP101
In recent years, the number of major projects specifying Mains Distribution Assemblies (MDA) with Form 4...
Read moreConstruction | 2022
Tunnel Distribution Assembly, 400A
Project number: SP098
Tunnel Boring Machines allow very long tunnels to be bored at an incredible pace, tirelessly working,...
Read moreConstruction | 2022
Site Power Cluster Providing 110V, 230V...
Project number: SP092
The wider use on UK construction sites of plug-in 400V and 230V equipment, working alongside plug-in...
Read moreConstruction | 2021
Assemblies with Interlocked Socket Outlets for...
Project number: SP087
BS 7375 is the British Standard covering the Distribution of Electricity on Construction and Demolition Sites....
Read moreConstruction | 2021
400V Supplies for Major Tunnelling Project
Project number: SP085
Since the start of 2021 the Blakley team has been busy designing and manufacturing bespoke distribution...
Read more