What are you looking for?

Filter:

Construction | 2025

CT Chambers for SSE Installations

Project number: SP117

We produce a standard range of CT Chambers, in ratings from 800A to 2000A, specifically designed...

Read more

Construction | 2024

Power Cluster and Power Cluster Plus...

Project number: SP116

Power Clusters are final distribution assemblies fed from a single supply, fitted with a group of...

Read more

Construction | 2024

Floodlighting of Large Scale Decommissioning Works...

Project number: SP113

The dismantling and decommissioning of a large industrial complex can be a lengthy and dangerous process...

Read more

Construction | 2024

800A Mains Distribution Assembly with Segregation...

Project number: SP112

800A Mains Distribution Assembly with Segregation to Form

Read more

Construction | 2023

Mains Distribution Assembly, 630A, with Form...

Project number: SP106

To enable major construction projects to meet fast track delivery programs without compromising on-site safety, we...

Read more

Construction | 2023

Supplies to Charging Stations for On-Site...

Project number: SP105

As major construction companies begin to grapple with the challenge of becoming carbon neutral, the adoption...

Read more

Construction | 2023

Tunnel Distribution Assembly, 630A

Project number: SP103

A recent requirement for free-standing, 400V tunnel distribution assemblies, which are to supply temporary Low Voltage...

Read more

Construction | 2022

Form 4 Mains Distribution Assembly, 2500A,...

Project number: SP101

In recent years, the number of major projects specifying Mains Distribution Assemblies (MDA) with Form 4...

Read more

Construction | 2022

Tunnel Distribution Assembly, 400A

Project number: SP098

Tunnel Boring Machines allow very long tunnels to be bored at an incredible pace, tirelessly working,...

Read more

Construction | 2022

Site Power Cluster Providing 110V, 230V...

Project number: SP092

The wider use on UK construction sites of plug-in 400V and 230V equipment, working alongside plug-in...

Read more

Construction | 2021

Assemblies with Interlocked Socket Outlets for...

Project number: SP087

BS 7375 is the British Standard covering the Distribution of Electricity on Construction and Demolition Sites....

Read more

Construction | 2021

400V Supplies for Major Tunnelling Project

Project number: SP085

Since the start of 2021 the Blakley team has been busy designing and manufacturing bespoke distribution...

Read more

Contact us

Are you ready to discover your high performance power and lighting solutions?

Go to Top