Industrial Building Services | 2017
Assemblies Incorporating 500A and 800A Single...
Project number: SP040
When a stand-by generator or a piece of heavy plant needs to be connected in a...
Read moreEvents | 2016
Containerised Switchboard
Project number: SP039
The Blakley team has recently been involved in a major project involving the design and manufacture...
Read moreConstruction | 2016
Site Mains Distribution Assemblies with form...
Project number: SP037
The construction of a major Power Station or Tunnel system requires significant amounts of temporary power,...
Read moreIndustrial Building Services | 2016
Mobile Power Clusters
Project number: SP034
Large industrial complexes often have a requirement for multiple voltages around a plant, whether for ad...
Read moreConstruction | 2016
Safer On-Site Testing
Project number: SP033
In order to enhance on-site safety, Blakley Electrics have produced a series of Mains Distribution Assemblies...
Read moreConstruction | 2015
Riyadh Metro Project
Project number: SP025
The Riyadh Metro Project is the Mass Transit Rail System currently being constructed in Riyadh, the...
Read moreMilitary | 2015
Field Power and Lighting for the...
Project number: SP023
When the UK Military deploys in the field, there is a significant requirement for power and...
Read moreEvents | 2014
Trailer Mounted 400A Distribution Assembly for...
Project number: SP015
When a domestic consumer or a business loses its electricity supply, whether it is due to...
Read moreConstruction | 2014
Power Cubes for Blast Furnace Refurbishment
Project number: SP013
When the UK's leading steel producer was planning the refurbishment of a major blast furnace, the...
Read moreTunnelling | 2013
Distribution Assemblies for Tunnelling
Project number: SP008
On large tunnel projects, Tunnel Boring Machines (TBMs) have changed tunnelling from a quasi mining activity...
Read moreConstruction | 2013
SIA Developed for a Southern Region...
Project number: SP006
Site Intake Assembly for a Temporary Builders Supply Temporary Builders Supplies for construction sites present some...
Read moreConstruction | 2013
Site Intake Assembly for a Temporary...
Project number: SP005
Temporary supplies for construction sites present some unique challenges for electricity suppliers, meter operators, electrical contractors...
Read more