What are you looking for?

Market leaders in Construction and Civil Engineering Products

Blakley Electrics are a UK market leader in the supply of power distribution equipment and lighting systems for use on construction and civil engineering projects.

Along with operational performance and safety, further enhancements have been made to help sites reduce their carbon footprint and their energy costs.

We can advise on the application of all our products, from providing simple temporary lighting schemes to the design of high current distribution assemblies incorporating Smart Meters and Power Factor Correction.

Male in high vis surveying construction site

Download brochure

Explore our Construction products

Construction Case Studies

Construction | 2024

Power Cluster and Power Cluster…

Power Clusters are final distribution assemblies fed from a single supply, fitted with a group of…

Read more

Construction | 2024

Floodlighting of Large Scale Decommissioning…

The dismantling and decommissioning of a large industrial complex can be a lengthy and dangerous process…

Read more

Construction | 2024

800A Mains Distribution Assembly with…

800A Mains Distribution Assembly with Segregation to Form

Read more

Construction | 2023

Mains Distribution Assembly, 630A, with…

To enable major construction projects to meet fast track delivery programs without compromising on-site safety, we…

Read more

Construction | 2023

Supplies to Charging Stations for…

As major construction companies begin to grapple with the challenge of becoming carbon neutral, the adoption…

Read more

Construction | 2023

Tunnel Distribution Assembly, 630A

A recent requirement for free-standing, 400V tunnel distribution assemblies, which are to supply temporary Low Voltage…

Read more

Construction | 2022

Form 4 Mains Distribution Assembly,…

In recent years, the number of major projects specifying Mains Distribution Assemblies (MDA) with Form 4…

Read more

Construction | 2022

Tunnel Distribution Assembly, 400A

Tunnel Boring Machines allow very long tunnels to be bored at an incredible pace, tirelessly working,…

Read more

Construction | 2022

Site Power Cluster Providing 110V,…

The wider use on UK construction sites of plug-in 400V and 230V equipment, working alongside plug-in…

Read more

Construction | 2021

Generator Interface Unit to Supply…

Towards the end of 2020, as normal business began to return, the Blakley Projects Team were…

Read more

Construction | 2021

Ultra High Output LED Floodlights

The installation of highly efficient LED floodlights for local area lighting has been universally accepted on…

Read more

Construction | 2021

Assemblies with Interlocked Socket Outlets…

BS 7375 is the British Standard covering the Distribution of Electricity on Construction and Demolition Sites….

Read more

Contact us

Are you ready to discover your high performance power and lighting solutions?

Go to Top