Docks and Harbours | 2014
Reefer Gantry Supply Assembly
Project number: SP017
Reefers (refrigerated containers) are used to transport perishable goods around the world. When they are in...
Read moreIndustrial Building Services | 2014
400A Lift Supply Panel for London...
Project number: SP016
As part of the updating of ten Central London Underground Stations, the Blakley project team have...
Read moreEvents | 2014
Trailer Mounted 400A Distribution Assembly for...
Project number: SP015
When a domestic consumer or a business loses its electricity supply, whether it is due to...
Read moreIndustrial Building Services | 2014
Isolated Supplies with Insulation Monitoring to...
Project number: SP014
When certain military and mercantile vessels are moored at pontoons or quaysides, an earth free IT...
Read moreConstruction | 2014
Power Cubes for Blast Furnace Refurbishment
Project number: SP013
When the UK's leading steel producer was planning the refurbishment of a major blast furnace, the...
Read moreHealthcare | 2014
NHS Mobile Trailer Supplies
Project number: SP012
Mobile Trailers have been widely used within the NHS for many years and they currently play...
Read moreIndustrial Building Services | 2013
Assemblies for Nuclear Decommissioning
Project number: SP011
Decommissioning a nuclear power facility is a very complex and lengthy process. In recent years various...
Read morePower Generation | 2013
Assemblies for the Maintenance of offshore...
Project number: SP009
When a major offshore wind farm operator decided to upgrade the maintenance facilities on an array...
Read moreTunnelling | 2013
Distribution Assemblies for Tunnelling
Project number: SP008
On large tunnel projects, Tunnel Boring Machines (TBMs) have changed tunnelling from a quasi mining activity...
Read moreConstruction | 2013
SIA Developed for a Southern Region...
Project number: SP006
Site Intake Assembly for a Temporary Builders Supply Temporary Builders Supplies for construction sites present some...
Read moreConstruction | 2013
Site Intake Assembly for a Temporary...
Project number: SP005
Temporary supplies for construction sites present some unique challenges for electricity suppliers, meter operators, electrical contractors...
Read moreIndustrial Building Services | 2013
Red Spot Fuse Boards for Sellafield
Project number: SP003
In 2012 the Red Spot fuse business was acquired by Cooper Bussmann, to add to their...
Read more