Construction | 2016

Site Mains Distribution Assemblies with form...

Project number: SP037

The construction of a major Power Station or Tunnel system requires significant amounts of temporary power,...

Read more

Construction | 2016

Safer On-Site Testing

Project number: SP033

In order to enhance on-site safety, Blakley Electrics have produced a series of Mains Distribution Assemblies...

Read more

Construction | 2015

Riyadh Metro Project

Project number: SP025

The Riyadh Metro Project is the Mass Transit Rail System currently being constructed in Riyadh, the...

Read more

Construction | 2015

Flori-67/3P 110 Volt Site Lighting

Project number: SP022

Since its launch at the start of 2012, Flori-67/3P, Blakley Electrics' unique plug-in 110V lighting system,...

Read more

Construction | 2014

Power Cubes for Blast Furnace Refurbishment

Project number: SP013

When the UK's leading steel producer was planning the refurbishment of a major blast furnace, the...

Read more

Construction | 2013

SIA Developed for a Southern Region...

Project number: SP006

Site Intake Assembly for a Temporary Builders Supply Temporary Builders Supplies for construction sites present some...

Read more

Construction | 2013

Site Intake Assembly for a Temporary...

Project number: SP005

Temporary supplies for construction sites present some unique challenges for electricity suppliers, meter operators, electrical contractors...

Read more